Secure Testing Center Installation for Pearson VUE (GED)

Completed Nov 2025 → Dec 2025

Led the installation and preparation of a secure GED testing center in accordance with Pearson VUE requirements. Work focused on infrastructure readiness, system configuration, and...

Secure Testing Center Installation for Pearson VUE (GED) thumbnail

Project Overview

Led the installation and preparation of a secure GED testing center in accordance with Pearson VUE requirements. Work focused on infrastructure readiness, system configuration, and environmental controls to support proctored, high-integrity testing.

Outcome

Delivered a fully operational testing environment that met Pearson VUE readiness standards, enabling secure, uninterrupted GED testing for candidates.

Project Phases & Timeline

Planning and Assessment Completed
Nov 2025 → Nov 2025

Goal

Establish baseline readiness of the testing environment and identify blockers preventing Pearson VUE validation.

What I Did

Picked up implementation work mid-stream and performed initial system checks using Pearson VUE’s published testing and readiness guidelines. Verified workstation configurations, network placement, and connectivity assumptions.

Challenges

During initial testing, workstations were unable to communicate with one another despite being on the same switch and subnet, preventing the environment from passing required pre-checks.

Outcome

Identified the issue as a systemic configuration problem rather than hardware or cabling, narrowing the scope of troubleshooting for the next phase.

Network and System Testing Completed
Dec 2025 → Nov 2025

Goal

Restore required communication between testing workstations and the proctor system.

What I Did

Performed focused troubleshooting on system and network configuration, isolating the issue to restrictive Windows firewall settings that were blocking required local communication. Corrected these configurations and re-validated connectivity between all machines. Configured and tested the proctor workstation responsible for administering and monitoring exams, and successfully initiated test distributions to candidate machines.

Technical Details

Controlled network environment, Windows system configuration, inter-workstation communication validation, and proctor system setup.

Outcome

All systems successfully communicated as required, and the testing environment passed functional checks.

Validation and Readiness Completed
Nov 2025 → Dec 2025

Goal

Achieve official Pearson VUE approval for operational readiness.

What I Did

Completed final validation steps and coordinated readiness confirmation with Pearson VUE. Verified stable operation of all testing and proctor systems under expected conditions.

Outcome

Received confirmation that the testing center met Pearson VUE requirements and was approved for live GED testing. Environment transitioned into operational maintenance status.